Dubai PR Network, Online Press Release from Dubai and Middle East
 
(Energy and Industry)
Filter PR by
  

Schneider Electric Adds New Features and PROFIBUS and PROFINET Compatibility to TeSys™ island Digital Load Management System

 
• Application avatars set new ease-of-use standards for pump and conveyor environments. 
• PROFIBUS and PROFINET protocol support now added to existing Ethernet/IP and Modbus TCP compatibility for a wider range of applications.
• Flexible load management now allows for autonomous operation mode.
 
Schneider Electric, the global specialist in energy management and automation, today announced important additions to its versatile TeSys™ island digital load management system solution.
When introduced, TeSys island redefined the way loads are managed and introduced unprecedented potential for efficiency in machine design, installation and service phases. TeSys island is a fully digitized and object-oriented load management system and an Industry 4.0 compliant data provider. With the availability of advanced power and diagnostic data, it is improving load performance and control while limiting downtime. The efficient modular/scalable TeSys island design translates into OEM assembly savings due to drastically reduced wiring, integration savings because of easy connectivity in mixed vendor environments, maintenance savings since remote maintenance is now possible. End users benefit from a rich suite of functions that drive operational efficiencies. Also, users and OEMs now have the benefit of predictive maintenance to help reduce downtime.
 
Motor control ease of use 
TeSys island application avatars, which are now added to the existing library of function-based avatars, are digital objects with pre-programmed functionality integrated. The two new configurable application avatars, one for pumping applications and one for conveyor applications, are designed to ensure easy integration into existing system infrastructures, through connection to the TeSys island bus coupler and I/O modules. Control modes can be chosen by the user to be either remote (PLC driven), autonomous (process variable driven) or local (operator driven).
 
Application avatar features enable flexible operation of the TeSys island digital load management system in a number of new ways:
• Autonomous control mode - The Autonomous mode enables TeSys island to control loads independently from the PLC. The TeSys avatar logic monitors values coming from sensors (i.e., pressure, flow) and matches the preset thresholds to make sure the load is operating in an optimized fashion. For example, with this mode, the application can continuously run even if the connection to the PLC is not available.  
 
• Predictive alarms - The TeSys island system can now generate alarms and alerts an impending failure before a failure occurs at the load level, thereby reducing instances of downtime. Predictive alarms are triggered by a combination of protection function alarms (generated from sensor values such as temperature or liquid viscosity) and application process variable input conditions (like the liquid level and flow pressure in a pump). For example, the system can combine those two warnings and indicate that there is a high chance of a pump running dry unless corrective actions are taken.
 
Additional communication protocols, protection enhancements, and enriched diagnostics
In addition to current references that enable communications within EtherNet/IP and Modbus-TCP environments, TeSys island is now available with PROFIBUS and PROFINET compatibility. In addition, the predictive maintenance avatars are dedicated to protection. Advanced diagnostics also help to detect the failure of an internal device within the control panel or failure of a connected load. 
 
TIA (Totally Integrated Automation) Portal integration
TeSys island now operates as a native device in the TIA portal. A TeSys island configuration defined at the SoMove configuration tool can be imported via an AML file interface. Also, a library of function blocks is available to be used within the TIA portal. As a result, OEMs and end users do not need to spend time programming and developing libraries, which helps to reduce engineering 
These new features have earned TeSys island third place in the Automation category award of SPS Nürnberg in 2019.


Posted by : DubaiPRNetwork.com Editorial Team
Viewed 10127 times
PR Category : Energy and Industry
Posted on : Sunday, February 16, 2020  6:21:00 PM UAE local time (GMT+4)
Replication or redistribution in whole or in part is expressly prohibited without the prior written consent of DubaiPRNetwork.com.
Previous Story : FANR Issues Operating License for Unit 1 of Barakah Nuclear ...
Next Story : Abu Dhabi Power Corporation Announces the Establishment of t...
Email this article Print this article

Share this article with your friends and followers
NewsVine
Back to Section Home

Related Stories



 
 
Most Viewed Press Release posted in the last 7 days
Dubai Jewellery Group Dazzles with Unprecedented Offers at the Dubai Shopping Festival [18532-Views]
Kia Unveils its All-New K3 for the first time in the Middle East at Riyadh Motor Show 2023 [13391-Views]
Formula E's GEN4 Suppliers Confirmed, To Debut in Season 13 [11025-Views]
Delight in unforgettable Festive Season at Grand Millennium Al Wahda in the Centre of Abu... [5150-Views]
Fouquet's Dubai Launches “Pardon My Brunch” [4485-Views]
niluu the Vegan Silkwear Brand Celebrates the Animal Kingdom with Elegant Print [4133-Views]
Emirates Post Group unveils Two Commemorative Stamp Sets Celebrating UAE's Hosting of COP2... [3965-Views]
Brookes Education Group and Enlightened Minds Partner to Unlock Student Potential in the M... [3895-Views]
World Tennis League Unveils Full Player Roster with Thrilling Matchups Set for Season Two [3813-Views]
ADEK's Khotwa Program Strengthens College Associations in Australia and New Zealand [3809-Views]
Revolutionizing Crop Growth: Tadweer Signs $2.5m Milestone Agreement with Aquagrain to Dep... [3735-Views]
Katch International Launches a Dedicated Department Focused on Sustainability and Brand St... [3678-Views]
Dubai Police and Arabian Automobiles Join Forces to Showcase GHIATH Smart Patrol [3665-Views]
Max Mara Celebrates Yara Shahidi as the 2023 WIF Max Mara Face of the Future Award® Recipi... [3657-Views]
Students from Swiss International School Dubai compete at their 'Boarding Olympics' [3608-Views]
Trillion Bees Coalition Launches at COP28 [3510-Views]
Tetra Pak and United Paper Mills announce next step in Landmark Agreement to Revolutionise... [3493-Views]
Dubai Airports Celebrates Milestone in making DXB more inclusive for People of Determinati... [3366-Views]
Ajman Tourism Unveils "TESLAM - UAE" Art Exhibition to Celebrate the UAE 52nd Un... [3350-Views]
OMEGA Launches Winter Tales [3333-Views]
Dubai Healthcare City Records a 12% Year-on-Year Increase as it Celebrates 21 Years of Exc... [3305-Views]
Etihad to Fly Big Bird to the Big Apple [3247-Views]
Dubai Airports Unveils Exceptional Welcome for COP28 Delegates [3239-Views]
IATA and ARC Extend Direct Data Solutions Partnership [3210-Views]
Mohammed Bin Rashid Library Celebrates 52nd UAE National Day With a Line-Up of Events [3128-Views]
 
RSS Facebook Twitter LinkedDin DubaiPRNetwork.com on Instagram
 
Top Sections
 
Top Stories